A PHP Error was encountered

Severity: Warning

Message: unlink(/var/www/vhosts/dorca.com.tr/httpdocs/cache/content_categories_medya_en_US): No such file or directory

Filename: drivers/Cache_file.php

Line Number: 124

Backtrace:

File: /var/www/vhosts/dorca.com.tr/httpdocs/application/helpers/sage_common_helper.php
Line: 66
Function: delete

File: /var/www/vhosts/dorca.com.tr/httpdocs/application/helpers/sage_common_helper.php
Line: 43
Function: Delete

File: /var/www/vhosts/dorca.com.tr/httpdocs/modules/base/controllers/BasePublicController.php
Line: 204
Function: Get

File: /var/www/vhosts/dorca.com.tr/httpdocs/sites/other/dorca/controllers/BasePublicSiteController.php
Line: 19
Function: GetContentCategoryByCode

File: /var/www/vhosts/dorca.com.tr/httpdocs/sites/other/dorca/controllers/Contents.php
Line: 8
Function: __construct

File: /var/www/vhosts/dorca.com.tr/httpdocs/index.php
Line: 13
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: chmod(): No such file or directory

Filename: drivers/Cache_file.php

Line Number: 107

Backtrace:

File: /var/www/vhosts/dorca.com.tr/httpdocs/application/helpers/sage_common_helper.php
Line: 49
Function: save

File: /var/www/vhosts/dorca.com.tr/httpdocs/application/helpers/sage_common_helper.php
Line: 61
Function: Set

File: /var/www/vhosts/dorca.com.tr/httpdocs/modules/base/controllers/BasePublicController.php
Line: 231
Function: Save

File: /var/www/vhosts/dorca.com.tr/httpdocs/sites/other/dorca/controllers/BasePublicSiteController.php
Line: 26
Function: GetContentCategoriesByParentId

File: /var/www/vhosts/dorca.com.tr/httpdocs/sites/other/dorca/controllers/Contents.php
Line: 8
Function: __construct

File: /var/www/vhosts/dorca.com.tr/httpdocs/index.php
Line: 13
Function: require_once

SPP+WPP

Solar Power Plant + Wind Power Plant (SPP + WPP)

The electricity generated from the SPP + WPP, which will be carried out in accordance with the regulations, can be used to meet the self-consumption, as well as the surplus energy can be supplied to the grid. It can usually be applied by natural/legal persons in places where there are not enough areas to install a Solar Power Plant (SPP) to meet their own consumption, or there is not enough radiation in the existing area, or where the wind potential is high efficiency. It is important to take into account the working hours of Solar Power Plants (SPP) and Wind Power Plants (WPP) correctly during the day in determining the Electrical Energy requirement.



Although off-grid applications are generally requested, they have recently started to be used in grid-connected (on-grid) applications in storage power generation facilities.

When performing SPP+WPP in our country, the Electricity Market Licensing Regulation and the Unlicensed Electricity Generation Regulation, the Electricity Market Storage Activities Regulation, the Electricity Indoor Facilities Regulation, the Electricity Strong Current Facilities Regulation vb. it is necessary to take into account many regulations, such as the standards of the country where the application is made, when installing in different countries.

When the correct design, rational shading calculations, analysis of the wind's potential on a daily and annual basis, meticulous work and significant knowledge are combined, the installation of high-efficiency power plants can be realized.