Dorca Enerji, as Dorca Enerji, has successfully completed the electrical distribution network project for CEYGEM (Ceyhan Business Development, Training and Consultancy Center), located in the Ceyhan district of Adana. Within the scope of the project, we carried out the installation and commissioning of the electrical infrastructure to meet the facility's electricity needs reliably and efficiently.

As part of the works, a 34.5 kV medium-voltage (MV) electrical distribution network, a 1,250 kVA 34.5 kV/0.4 kV transformer, circuit breakers, metering cells, and a concrete transformer substation were installed. All necessary equipment was integrated to ensure the safe transmission and distribution of electrical energy and the seamless operation of the entire system.

With a transformer capacity of 1,250 kVA, the CEYGEM Electrical Distribution Network was connected to the Çukurova Electricity Distribution Network, and the facility was successfully energized.

With the slogan "Change the Future," Dorca Enerji delivers turnkey engineering solutions in the field of electrical energy, a clean energy source.


Project Name
Ceygem Electricity Distribution Network   
Installation Location
Ceyhan/Adana
GPower
1250 KVA 


Its purpose
Installation and commissioning of the Power Transmission Line, 1250 kVA transformer, circuit breakers, and measurement cells.

Power Plant Feature
On Grid