It is a project of the General Directorate of Meteorology to provide the energy of the Meterological Measurement Stations (OMGI) at the Elmadağ facilities located at an altitude of 1,800 meters by using Solar and Wind Energy.

With the signing of the contract, we completed the services of providing products, drawing and manufacturing the Solar tree project, Special manufacturing of Hybrid Panel, providing GES, WES and Battery materials, Digging the ground for the Solar Tree, making iron reinforcement, Preparing and concreting anchors, installation and commissioning under heavy snowfall in 1 week in difficult winter conditions.

At the International Renewable Energy Congress of Turkey (The Turkish International Renewable Energy Congress (www. greenpowerconferences.com /TIREC), 2 after the Solar House project of Antalya Metropolitan Municipality in the short list announcement. 1 as a company, too. We became.
The most important feature of the installed system is that it is user-friendly, extremely resistant to environmental stresses, and the angle of the solar panels can be changed in summer and winter periods.
The Saffir-Simpson scale is used in the classification of hurricanes in the world. Meterology GM SPP 155 km/h with no problems even at the wind speed 2. The degree has maintained electricity production during the storm. There is no known system registered in the world as a hybrid SPP/WPP system. With this system, we have no competitors in our country.

GEL batteries are used as batteries in the storage system, the weight of the batteries, rail battery slots that will allow easy operation in the panel, dc lighting, AC sockets, we serve our customer with our user-friendly approach.

Dorca Energy is committed to making a good project that will meet the user's needs.


Project Name
Meteoroloji GM SPP+WPP

İnstallation Location
Çankaya/Ankara 
SPP Application
Land SPP 
Power
1 kWac RES/870 Wp GES
Its purpose
electricity generation necessary for meteorological systems   
Power Plant Feature
On Grid/Off Grid